The hip Hotel Grand Joanne in Copenhagen has been completely renovated

Päivämäärä: 7.10.2024

The fire advisors have solved the wet room challenge with the help of wedi

Hotel Grand Joanne is located on the cozy Vesterbro in Copenhagen. The beautiful newly restored 19th century building with six floors, with 162 rooms and Roof-top bar has loads of craftsmanship and design qualities, and emphasis has been placed on enhancing the special relaxed and at the same time stylish Vesterbro atmosphere everywhere.

The restoration took place from the spring of 2021 until the autumn of 2022. As part of modernizing, 162 beautiful bathrooms have been created here, which honour all requirements for fire protection and ease of construction; quite in keeping with what serves a fine old estate best.

The fire consultants from North by Howden have helped wedi with fire technical documentation for this project

In connection with the refurbishment, the wet room supplier wedi® came into play; since the hotel has wooden beams on all floors, it was a challenge to create new bathrooms that could meet the requirements for fire safety and did not impose too heavy of weight on the building.

Builder Borris Tangaa Nielsen, who owns several hotels in Scandinavia, and contractor Mortensen & Nielsen ApS got help with fire consultancy documentation through wedi. Therefore, the engineers and the building's fire advisor could give a well-founded assessment of the extent of the restoration. The drawing material from wedi was in order, and all construction principles documented that safety was under control. That is why wedi was given the extensive and exciting task.

Correct drops and gentle renovation methods

It took extra consideration to solve the challenges with central and decentralized drains, which are extremely important in an older building. Fortunately, wedi’s product range can solve such challenges.

The 162 bathrooms in three different sizes have varying designs. The linear drain floor system Fundo Riolito is primarily used throughout, and the remaining areas in the rooms have wedi's specially developed single-sided drop plates. Due to variation in drainage and construction options, wedi's Fundo Primo floor system with envelope drop has been used in some bathrooms. The construction has taken place in accordance with wedi's construction principle and is laid over the existing beam layer.

wedi's floor systems and drop plates are installed with wedi 610 adhesive and sealant. Ardex has helped with the waterproofing problem of the installed electric floor heating in wedi's floor systems supplied by Devi.

'A restoration task at this level, where virtually everything has been taken out of an older building to be rebuilt, has required a detailed description of all construction principles - especially in relation to the wet rooms. wedi can deliver that. The beautiful old property has been renovated for more than the purchase price, and the hotel is now facing the future with quality and future-proof solutions - in addition to being an aesthetic pleasure, it has sustainability at a very high level,' says Henrik Ohrt, sales manager, and project manager at wedi, Denmark.

Lisää tuotteesta Floor element: Fundo Riolito

Floor element: Fundo Riolito

A beautiful floor element with a built in drop and an elegant linear drain.

can be used in Nordic Swan eco-labelled constructions
M1 3753 certifikat FIN
10 års garanti
Assembly instructions channel drain substructure element
Assembly instructions horizontal channel drain, DN 50
Assembly instructions linear channel cover standard/exclusive
Assembly instructions vertical channel drain, fire protection collar, DN 50
ETA
Eurofins C-3043-08
M1
EPD Fundo floor-level shower element
EPD wedi building boards

Tilaa Rakennusfaktan uutiskirje – saat tuoteuutiset viikoittain sähköpostiisi

Sulje